Evaluasi Kinerja Revit dan Cubicost dalam Perhitungan Quantity Take Off Struktur Beton Berbasis BIM 5D
https://doi.org/10.36309/goi.v31i2.423
Arif Luqman Hakim(1*)
Affiliation
(1) Program Studi Teknik Sipil, Universitas Mercu Buana, Jakarta
(2) Program Studi Teknik Sipil, Universitas Mercu Buana, Jakarta
(*) Corresponding Author
How to Cite
Abstract
Keywords
Full Text:
PDF HAL. 310-318References
Yani M. Analisis penggunaan aplikasi manpro pada life cycle proyek konstruksi. Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) 2024;12(1):111-122. https://doi.org/10.24929/ft.v12i1.3316
Sacks, R., Eastman, C. M., Lee, G., & Teicholz, P. (2018). Bim handbook.. https://doi.org/10.1002/9781119287568
Ghaffarianhoseini, A., Tookey, J., Ghaffarianhoseini, A., Naismith, N., Azhar, S., Efimova, O., & Raahemifar, K. (2017). Building Information Modeling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges. Renewable and Sustainable Energy Reviews, 75, 1046-1053. https://doi.org/10.1016/j.rser.2016.11.083
Alifudin, R., & Mirnayani. “Pengaruh Implementasi BIM terhadap Akurasi dan Waktu Perhitungan Volume Tanah pada Proyek Infrastruktur,” in SNTEKPAN XII : Menjembatani Energi Berkelanjutan dan Ekonomi Hijau melalui Transformasi Riset dan Teknologi Terapan, Institut Teknologi Adhi Tama Surabaya, Oct. 2024. Accessed: Nov. 24, 2024. [Online]. Available: https://ejurnal.itats.ac.id/sntekpan/article/view/6498
Mahendra, M. (2023). Calculation of cost estimation based on building information modeling in construction projects. International Journal of Natural Science and Engineering, 7(1), 71-83. https://doi.org/10.23887/ijnse.v7i1.57640
Moses T, Heesom D, Oloke D. Implementing 5D BIM on construction projects: contractor perspectives from the UK construction sector. J Eng Des Technol. 2020;18(6):1867-88. doi:10.1108/jedt-01-2020-0007
Noviani S, Amin M, Hardjomuljadi S. The impact of 3D, 4D, and 5D building information modeling for reducing claims to service providers. Sinergi. 2022;26(1):47-58. doi:10.22441/sinergi.2022.1.007
Hosamo H. Navigating the adoption of 5D building information modeling: insights from Norway. Infrastructures.2024; 9(4):75. doi: 10.3390/infrastructures9040075.
Putra, T. K., Widhiatmoko, I. S., Ramadhani, S. P., Nughroho, F. A., Saputra, A., Madani, Mu. P., Rosita, S., & Kurniawan, D. (2018). Modul Ajar - Building Information Modelling - Level “Awareness.”
Mahendra M. Calculation of cost estimation based on building information modeling in construction projects. Int J Nat Sci Eng. 2023;7(1):71-83. doi:10.23887/ijnse.v7i1.57640.
Alifa, R. N., Izza, M. N., Hakim, F. F., & Abda, J. (2024). Analisis Perbandingan Quantity Take-Off Cubicost TAS dan TRB Terhadap Perhitungan Konvensional Pada Area Plaza Basement Lantai Basement 1 Proyek Revitalisasi Masjid Agung Batam Centre. Jurnal Inovasi Konstruksi, 3(1), 15–25. https://doi.org/10.56911/jik.v3i1.65
Article Metrics
Refbacks
- There are currently no refbacks.

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-Berbagi Serupa 4.0 Internasional
DOI: 10.36309 Visitor Number: View Go Infotech stats